New Home Design

Architectural review and complete material selections for a build, settled before ground is broken.

Book Free Consultation

Google

5.0

(120+ Houzz reviews)

Houzz

12

(Years Best of Houzz)

Newly built custom home interior with a vaulted ceiling and bespoke finishes

The decisions that determine how a new house feels are made long before move-in. We review the architectural plans while they can still be changed, catching the awkward rooms and missed opportunities on paper, then carry every material selection through to completion. Seventeen years as the exclusive design partner to Old Town Design Group means we know exactly where a build tends to go wrong.

What the work covers

  • Architectural plan review before build.
  • Layout refinements and room proportions.
  • Complete interior material selections.
  • Cabinetry and millwork specification.
  • Plumbing and lighting schedules.
  • Tile, stone and flooring packages.
  • Paint and finish coordination.
  • Builder and trade liaison throughout.
  • Final selections walkthrough.

1

Reviewed while it can still change

We read the architectural plans before ground is broken, which is the only point where a poor layout is cheap to fix.

2

Seventeen years with Old Town

As the exclusive design partner to Old Town Design Group, we know how a custom build actually comes together.

3

Every selection carried through

Cabinetry, tile, stone, plumbing, lighting and paint are specified and tracked to completion, not handed over as a mood board.

How we work for you

We make kitchen renovation simple, transparent, and stress-free from the first consultation to the final walkthrough.

STEP 01

Discovery Call

A complimentary twenty-minute call to hear what you are planning and work out whether we are the right studio for it.

STEP 02

In-Home Consultation

We walk the space with you, talk through how your household really uses it, and put a design agreement in place.

STEP 03

Planning and Estimate

Detailed drawings, 3D views and full material selections, followed by a comprehensive estimate with nothing left open.

STEP 04

Execution and Reveal

Our own team runs the build and the trades, keeps the site clean, and hands the finished rooms back to you.

Built on trust

We earn your confidence through honest communication, quality craftsmanship, and reliable service from start to finish.

Whole-home remodel in Carmel with reconfigured living spaces

98%

Client Satisfaction Rate

One team, one responsibility

Design and construction sit under the same roof, so there is never a gap between the drawings and the crew building them.

A home you can live in

Dust control, protected floors and a daily clean-down are standard, because most of our clients stay in the house throughout.

Planned in 3D first

You walk the finished space on screen before anything is ordered, so the changes happen in the design rather than on site.

Book Free Consultation

Question? Answered

Common questions about home remodeling in Carmel and the surrounding areas.

A kitchen typically runs six to twelve weeks on site, a bathroom three to six weeks, and a finished basement eight to twelve weeks. Whole-home renovations generally take three to six months. Design and planning happen before any of that, and you receive a week-by-week schedule before demolition begins.

Most clients stay in the house. We protect floors, seal off the work area, control dust and clean the site down at the end of each day. For a whole-home renovation where services are off for extended periods, we will tell you honestly at the planning stage if moving out for part of it would be easier.

We work throughout Carmel, Zionsville, Fishers, Westfield, Noblesville, McCordsville, Geist, Meridian Hills and the north side of Indianapolis. Our studio is at the Indiana Design Center on South Rangeline Road in Carmel.

Our designers handle the full scope, from space planning through to the final styling. If you are already working with a designer you trust, we are happy to build to their drawings. What we would not recommend is splitting the design between two parties, because that is where projects lose coherence.

Sooner than most people expect. Design, selections and lead times generally account for more calendar time than the build itself, particularly where custom cabinetry or imported stone is involved. If you want a kitchen finished before the holidays, the conversation should start in spring.

Start with the discovery call. It takes twenty minutes, costs nothing, and is genuinely intended to establish fit in both directions. If your project would be better served by another studio, we would rather say so at that point than three months in.

Still have questions?Read all FAQ’s

Ready to update your Carmel home?

Start with a complimentary twenty-minute discovery call. No pressure, and no obligation.

Schedule a Consultation

120+ FIVE-STAR HOUZZ REVIEWS

25+ YEARS IN CENTRAL INDIANA

BEST OF HOUZZ, TWELVE YEARS RUNNING